Industrial Storage & Racking
Systems

A high-performing warehouse relies on choosing the right storage systems. At Agir Installation, we offer a complete installation service for a wide range of industrial racking and shelving, from Montreal to the entire Quebec region.

An intervention tailored to your reality

The right system for every warehouse reality.

Selective racking, drive-in, push-back, pallet flow, cantilever, mezzanines, industrial shelving: each system responds to a different inventory profile, rotation, and building constraint. Before choosing, we clarify with you the type of products, volumes, and available space.

Our team helps you compare options based on your actual inventory, then installs the chosen structure according to CNESST standards and manufacturer guidelines.

What sets each system apart

✓

Direct access to every pallet (selective racking) or maximum density (drive-in, push-back)

✓

Strict FIFO rotation for perishable products (pallet flow)

✓

Long and irregular loads handled by cantilever racking

✓

Vertical space maximized with industrial mezzanines

✓

Small parts and manual picking organized with industrial shelving

Your next step

Tell us about your warehouse

Describe your inventory, your volumes, and the available space. We’ll help you identify the most suitable system.

Scope, timeline, and technical requirements are confirmed after assessing your project.

01

Understanding your inventory

We identify your product profile, volumes, and desired rotation.

02

A system matched to your reality

Each system has its own components, levels, accessories, and assembly constraints.

03

A clear technical discussion

Plans, loads, traffic flow, and available documents are reviewed before confirming the work.

Intervention scenarios

Examples to help you picture it

These scenarios illustrate the situations we regularly assess. Each intervention is tailored to the system, the condition of the components, and your operations.

←
→
Entrepôt lumineux avec rangées d'étagères et bacs jaunes remplis de cartons et colis

Illustrative example

Commissioning a distribution centre

Illustrative scenario: progressive assembly of selective racking while coordinating work aisles and receiving areas.

Rayonnage cantilever extérieur bleu et orange installé le long d'un mur de bâtiment industriel

Illustrative example

Layout for varied loads

Illustrative scenario: combining pallet racking with elements for long or bulky products.

Our approach

A clear mandate, from assessment to completed work

01

Understanding your project

We discuss the system, the space, expected loads, access, and your desired timeline.

02

Preparing the site

Work areas, the assembly sequence, and operational constraints are confirmed.

03

Installing per the confirmed scope

Components are assembled and positioned according to the agreed documents, guidelines, and conditions.

04

Final review

We review the project details with you and identify any useful next steps.

Preparing your request

The information that speeds up a useful assessment

You don’t need to have everything on hand. These details simply help us better understand your environment and guide you more quickly.

✓

Site layout plan or sketch of the warehouse, if available

✓

Dimensions and weight of the pallets, products, or loads to be stored

✓

Type of forklift and desired width of work aisles

✓

Clear height, floor conditions, and obstacles to consider

✓

Desired timeline and any periods to avoid in your operations

Frequently Asked Questions

Answers before planning your project

Every warehouse is different. These answers will help you prepare a more complete request; an assessment will then confirm the scope of the work.

The scope may include selective racking, drive-in systems, push-back, pallet flow, cantilever, mezzanines, and shelving. The target system is confirmed during the assessment.

Plans, sketches, product spec sheets, and manufacturer documents are very helpful. If some documents are missing, we’ll work with you to determine what’s needed before confirming the work.

Depending on access, areas that need to be isolated, traffic flow, and the type of project, it’s often possible to plan the work in phases. The approach is confirmed for your site.

Duration depends on the type of system, the number of bays, site access, accessories, and the work schedule. An assessment allows us to propose a suitable timeline.

They communicate the limits that apply to the system in its given configuration. Any question about capacity or modification must be validated with the relevant documents and, when required, by engineering.

Let’s talk about your project

Ready to put your warehouse into service?

Submit the details you have and talk to our team about an installation tailored to your environment.

Our solutions

Our racking
and shelving systems

Explore our different industrial storage solutions. Our teams are trained to install these systems according to exact manufacturer specifications and current safety standards in Quebec.

Why Agir Installation

The importance of a
professional installation

Choosing the right system is only the first step. The quality of the installation is crucial to ensuring the safety of your employees and the longevity of your investment.

By trusting Agir Installation with the assembly of your racking, you get rigorous work, solid floor anchoring, perfectly aligned structures, and full compliance with the CNESST and RNQ standards in effect in Quebec.

🔩

Certified anchoring

Each upright is anchored according to manufacturer specifications and expected loads.

📏

Perfect alignment

Laser leveling and plumb verification at every stage of assembly.

🛡️

CNESST compliance

Installation compliant with current Quebec safety standards.

📋

Complete documentation

As-built plan, capacity sheets, and load plates provided at delivery.