Agir Installation

Section 1 / 15

Contact details
← Back

Full Quote

Section 1 / 15

Contact details

Your contact information will allow us to send you the quote and contact you for any questions.

Preferred means of communication

Section 2 / 15

General project description

What type of project would you like to undertake? *

Is your request only for labour, or do you also want equipment?

Have the shelving or pallet racks already been purchased?

Section 3 / 15

Storage system type

What type of racking is involved in the project? (Multiple selection possible)

Is the equipment new, used or a mix?

Section 4 / 15

Dimensions and quantities

Provide the available information. Approximate estimates are accepted.

Do any accessories need to be installed? (Wire mesh, panels, safety bars…)

Section 5 / 15

Loads, pallets and goods

Will products be stored on pallets?

Pallet format used

Approximate maximum weight per loaded pallet

Will material handling equipment be used?

Section 6 / 15

Building and installation area

Building type

Is the building currently operational?

Floor type in the installation area

Are there obstacles in the installation area? (Multiple selection)

Section 7 / 15

Site access and lifting equipment

Is a loading dock available?

Are there restrictions regarding trucks, delivery hours or access?

Lifting equipment available on site (Multiple selection)

Is the installer authorized to use the equipment on site?

Section 8 / 15

Existing equipment and site preparation

Do racks, inventory or debris need to be moved before work?

Who will be responsible for clearing the installation area?

Do existing racking systems need to be dismantled?

What should we do with the dismantled equipment?

Are any components damaged, bent, rusted or missing?

Section 9 / 15

Site safety and requirements

Does the site require any specific training or certifications? (Multiple selection)

Does the work need to be performed on a specific schedule?

Will the work need to be coordinated with other contractors on site?

Section 10 / 15

Timeline

Is the schedule flexible?

Will the material be delivered before the planned start of work?

Section 11 / 15

Plans, photos and documents

Do you have a floor plan or a racking layout plan?

Do you have plans approved by an engineer or the manufacturer?

Do you need help preparing the layout plan?

Attach documents (optional)

Section 12 / 15

Permits, engineering and inspections

Does the project require a building permit, engineer approval or a municipal inspection?

Who will be responsible for obtaining permits and approvals?

Will a final inspection or installation report be required?

Do load capacity plates need to be provided or replaced?

Section 13 / 15

Budget and decision-making process

Approximate budget for the project

What stage are you currently at?

Section 14 / 15

Site visit

Would you like to schedule a site visit?

Best time for the visit

Will a responsible person be present during the visit?

Section 15 / 15

Additional information